This page includes several Project management documentation available for download, as described below.

PLANNING

Facility Planning

Checklist containing the conceptual requirements, AFE generation and approval, accounting, and organization aspects of facility planning used by the facilities engineering group. It also assigns responsibilities and dates to each checklist item.

PEP CheckList

A project execution plan is the overall project planning document. It will consist of sections that address such topics as communications, materials management, and safety. This form can be used as a checklist to select the appropriate major divisions of the project execution plan.

General Conditions

This form is a contractor's project planning document for establishing the project's service needs. It is submitted to and used by the Purchasing Department for procurement.

Project Execution

This form is a checklist for the project team leader executing the project. It is a planning checklist for the project execution and assigns responsibilities and dates to each checklist item.

Bid Preparation

Planning document for the project team developing the bid package that assigns responsibilities and dates for each checklist item. It also serves as a responsibility chart for the project estimator.

Potential Task List

The project execution plan will address the assignment of various project management tasks. This list contains typical project management tasks and serves as a checklist.

Pre Project Planning Quality Index

Pre-project planning index scoring card for evaluating the quality of major planning phases of the project.

ORGANIZATION

Project Team Charter

There is a trend toward managing projects with empowered teams that consist of representatives of the owner, designer, constructor, and (when appropriate) the construction manager organizations. It is important that the team have a mission statement and be empowered to make decisions. This document organizes the project team charter.

Team Meeting

Team discussions and assignments made at team meetings should be documented and distributed in the form of meeting minutes or a team meeting report. It is important that this be managed in a timely fashion to be effective. This document can help to organize and manage team meeting information.

Responsability by Phase

Phase responsibility matrix for large projects assigning responsibility for the following phases: Team Selection, Conceptual Planning, Schematic Design, Design Development, Contract Documents, Bidding, and Construction.

Response Matrix Construction

Construction phase responsibility matrix for a large project focusing on the construction phase.

Small Projects Response Matrix

Responsibility matrix designed for small projects.

OBJECTIVE SETTING

Objectives CheckList

The project team should draft a set of project objectives. These objectives need to be aligned with the corporate business objectives of the represented companies. This form suggests areas to be addressed when developing the project objectives statement.

Objectives Matrix

Report card taken by the project team to measure team progression at certain project intervals. Helps to identify weak areas in obtaining objectives.

SCOPE DEFINITION

Scope Development CheckList

Checklist used to facilitate scope definition for the objective setting, conceptual, and AFE phases of a project.

DESIGN MANAGEMENT

Engineering CheckList

Checklist containing project engineering and design items that assigns responsibilities and dates.

COST / SCHEDULE MANAGEMENT

Project Control List

Regardless of whether or not formal CPM scheduling tools are being utilized, it is helpful if the project manager develops a set of critical milestones and tracks the attainment of those milestones on either a computer-based or paper-based system. This document lists the critical milestones tracked from notice to proceed to final payments.

Cost Report

Spreadsheet that tracks the original budget against various project change orders.

Cost to Complete Summary

Spreadsheet tracking contract status, cost to date, and remaining project costs with manual adjustments.

Executives Project Summary

Spreadsheet for a project engineer or manager of projects within a company to track and summarize several different projects regarding status, schedule, cost, change orders, and contract value, etc.

Estimate

Spreadsheet indicating the WBS coding for estimated overhead items with line items extensions for quantities, costs, subtotals, taxes, insurance, and totals. It also calculates cost per SF.

Small Project Forecast

Form used to track small projects in an existing industrial facility by the resident design and construction engineer. Tracks the budget, forecasted costs, and actuals.

Labour Cost Curve

Spreadsheet that assigns estimated weekly labor costs to a project and graphs the weekly cumulative costs. This curve is used to track against actual costs throughout the project duration and helps to determine a cost performance index.

Billing Curve

Spreadsheet assigning forecasted and actual monthly billing costs to a project. It tracks the project billing status by graphing the planned billings, actual billings, and actual costs on one graph. This curve is used to track costs throughout the project duration and helps to determine a cost performance index.

Small Project Statusing

Form used to pull data from an existing accounting system and track project performance.

Gantt Chart by MsProject

Sample Gantt Chart developed in MS Project for scheduling the construction of a garage. Also indicates the durations and WBS codes for each activity.

INFORMATION MANAGEMENT

Requests and Changes log

Contractors may request changes in the scope of work. The owner or owner's representative may or may not approve these change requests and issue a corresponding change order. Change requests and change orders can be tracked using a database file. Fields in the file can include work description or code, approval status, work status, basis of payment, schedule impact, and dollar amount. This document tracks these items.

Project File System

Checklist for setting up a standard system for filing project information. Aids in standardizing the filing system's information throughout a company.

PM Internal Corrdination Guide

Guide for assigning responsibility within a project for the project team. Good for when the project involves part-time staffing and resources such as estimating and scheduling. Helps to communicate the needs of the project to other departments.

Project manual

For a relatively small project, the project manual is a single three ring binder that contains the Project Control List, subcontracts, schedules, owner invoices, job cost reports, and the major project management forms and logs. This form specifies the suggested contents of the project manual.

Project Execution Progress Report

Checklist containing key items, resources, and events to be included in a project execution progress report.

Transmittal

When the project manager transmits plans, shop drawings, subcontract forms, test reports, change orders, or samples to other parties, a letter of transmittal is included. This is a template to generate the letter of transmittal.

RFI

A template form such as this can be used by the constructor to request information from the owner's representative. The owner's representative can respond to the request using the same form.

Submittals log

The submittal log tracks the status of shop drawings, test reports, samples and other documents that have been submitted to and received from other entities.

Sub Contractor Supplier List

Document used by the project manager to determine how to package subcontractor jobs. Helps to insure all parts or aspects of the project are addressed and covered. Great communication tool and document for reference throughout the project duration.

Letter of transmittal

When the project manager transmits plans, shop drawings, subcontract forms, test reports, change orders, or samples to other parties, a letter of transmittal is included. This is a template to generate the letter of transmittal.

Letter of intent

Document providing guidelines on how to write a letter of intent. Letters of intent must be converted to contract ASAP. A letter of intent template is also included.

Open Issues . DOC

Action list document used to manage priorities within a project by assigning responsibilities and dates to each item.

Open Issues .XLS

Action list spreadsheet used to manage priorities within a project by assigning responsibilities and dates to each item.

BackCharge

Form used to notify subcontractors or supplies of claims against them.

Cleanup Notice

Form that puts subcontractors on notice regarding failure to perform cleanup responsibilities on a project.

Phone Conversation Record

Form used to record telephone conversations and document information discussed. Can also be used as a confirmation document for key pieces of information. Should only record facts and not opinions for court admissibility.

CHANGE MANAGEMENT

Change Order

This template can be used to generate the change order document. Also serves as a notice for a change in the scope of work.

Field Change Auth

Form used to authorize the constructor to perform work differently for what is specified in the contract documents.

CO Log

Form used to log and track project change order numbers, descriptions, values, dates, and approvals.

T&M Ticket

Form used to request reimbursement for change order or field authorization work that is to be performed on a cost reimbursable basis.

Pending CO Log

Spreadsheet used to track submitted pending change orders to determine their status.

Request for Change Order

Letter template requesting a change order.

Request CO Log

Spreadsheet used to track requested change orders and document status, dates, values, and descriptions.

Request CO Log Example

Example spreadsheet used to track requested change orders and document status, dates, values, and descriptions.

Change Order Summary

Form used to summarize the total cost effect of a particular change order to date.

Summary Example

Example form used to summarize the total cost effect of a particular change order to date.

Change Trend Notice

Form that tracks particular changes to date to forecast project trends and effects.

Comment on Change

Document published in Georgia Construction Law discussing construction change management. Provides good advice on how to deal with and manage change.

MATERIALS MANAGEMENT

Procurement Checklist

Checklist containing project procurement actions and items and assigns responsibilities and dates.

Procurement Plan

Document similar to a project manual used to plan procurement activities. Includes a project overview, cost savings and avoidance, procurement strategy, projected distribution of expenditures, equipment sourcing list, project challenges, and quality assurance.

BIDTAB

This form can be used to compare the unit price quotations of multiple suppliers. It is best utilized in a spreadsheet format. Unit prices that vary significantly from the norm can be identified and follow-up contacts initiated with the supplier if necessary.

Contract and Purchase Order Log

This is a database file or list of subcontracts and purchase orders issued by the contractor. The file contains information related to the purchase order or subcontract including CSI specification section, responsible party, dates, costs, and change status. Database sorts can generate multiple useful reports.

Sample Request for SubBid

This form is used to solicit bids from subcontractors. An important part of the form is a clearly worded scope of work statement.

Submit

The submittal log tracks the status of shop drawings, test reports, samples and other documents that have been submitted to and received from other entities.

Submittal Log A

The submittal log tracks the status of shop drawings, test reports, samples and other documents that have been submitted to and received from other entities.

Submittal Log

The submittal log tracks the status of shop drawings, test reports, samples and other documents that have been submitted to and received from other entities.

Equip Log

Form used by field supervisors to track rented equipment on the job site. Includes date received, vendor information, planned and actual return dates, and off rent control numbers.

Concret Placement Card

Checklist to insure all preliminary actions are covered before concrete is placed. Also records and documents conditions when concrete is placed.

Concrete Log

This form can identify differences between takeoff or estimating quantities of concrete and the quantities actually put in place.

Request for Subcontractor CO

This form is used to solicit change quotation bids from subcontractors. An important part of the form is a clearly worded scope of work statement

SAFETY

Safety Planning

Checklist for preparing a safety plan for a project.

Hazard Analysis

Checklist for performing a thorough hazard analysis for a project along with recommended solutions.

Safety Audit

Periodic site inspections using forms such as this can document good and poor safety practice. (This is a small portion of an actual form.) Can help to identify trends throughout the project duration.

Safe Work Permit

Form used to insure pre-task safety training has been accomplished and documented.

Lockout Audit

Form used to insure pre-task lockout items have been accomplished and inspected.

Trainning log

The names of persons that received safety training should be documented. This forms tracks the required documentation. These documents help to mitigate any possible problems resulting from an OSHA inspection.

Injury Report

Form used to track information around a particular job injury

Subtance Abuse Program

Form used for subcontractor documentation of drug screening prior to project attendance.

Safety Inspection

Checklist including key items to look for when conducting a safety inspection.

Safe Acts Card

Scoring card index system to track safety trends on a project. Includes instructions for scoring an index.

QUALITY MANAGEMENT

Quality Audit

This is another variation of a performance evaluation form. Similar forms can be used to evaluate contractor performance to make incentive payments.

Contractor Performance Evaluation

Throughout the project, and/or at the end of the project, the owner's representative may wish to evaluate the performance of the contractor. Similarly, the contractor or construction manager may wish to evaluate the performance of subcontractors.

Sub Performance Evaluation

Throughout the project, and/or at the end of the project, the owner's representative may wish to evaluate the performance of the contractor. Similarly, the contractor or construction manager may wish to evaluate the performance of subcontractors.

Project Visit Report

Audit checklist for looking at key project items and documenting the project visit and evaluation. Includes recommendations.

START UP

Project Start Up

Checklist for items that need to be planned for project startup and close-out.

Inspection Report

Checklist used for inspecting the completed facility.

Quality Review Guide

Document outlining the procedure to follow in the early design phase and pre-construction phase to improve the quality of projects by getting input from crafts, SHEA, contractors, and the business representative before the design is started.

Warranty Log

Form used to log and track equipment or systems with warranties and terms.